Compartir
Seismic Considerations For the Transition Break Size (en Inglés)
Commission, U. S. Nuclear Regulatory (Autor)
·
Createspace Independent Publishing Platform
· Tapa Blanda
Seismic Considerations For the Transition Break Size (en Inglés) - Commission, U. S. Nuclear Regulatory
S/ 100,00
S/ 200,01
Ahorras: S/ 100,00
Elige la lista en la que quieres agregar tu producto o crea una nueva lista
✓ Producto agregado correctamente a la lista de deseos.
Ir a Mis Listas
Origen: Estados Unidos
(Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el
Miércoles 31 de Julio y el
Viernes 09 de Agosto.
Lo recibirás en cualquier lugar de Perú entre 2 y 5 días hábiles luego del envío.
Reseña del libro "Seismic Considerations For the Transition Break Size (en Inglés)"
The U.S. Nuclear Regulatory Commission (NRC) has been considering revision of the regulatory requirements for the emergency core cooling system (ECCS), as set forth in Title 10, Section 50.46, of the Code of Federal Regulations (10 CFR 50.46); Appendix K to 10 CFR Part 50; and General Design Criterion (GDC) 35. In particular, those requirements state that the ECCS shall be sized to provide adequate makeup water to compensate for a break of the largest diameter pipe in the primary system [i.e., the so-called "double-ended guillotine break" (DEGB)]. Consequently, in order to risk-inform the break size, the staff of the NRC proposed the concept of transition break size (TBS). In addition, the NRC developed pipe break frequencies as a function of break size using an expert elicitation process for degradation-related pipe breaks in reactorcoolantsystemsoftypicalboiling-andpressurized-waterreactors. Thatelicitationfocusedon determining event frequencies that initiate by unisolable primary side failures that can be exacerbated by material degradation with age under normal operating conditions. The purpose of this study was to assess potential seismic effects on the postulated TBS, and to provide information to facilitate review and comment regarding the proposed risk-informed revision of ECCS requirements in 10 CFR 50.46. Thus, this report evaluates the seismic effects, using different approaches to evaluate flawed and unflawed piping, and indirect failures of other components and component supports that could lead to piping failure.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.